Pages

Tuesday, June 25, 2013

Quilting and Catching up!

Tulip quilt is now on the longarm and the quilting has started.  Started with all the stitching in the ditch first, which will probably take the rest of the week to complete.  Then, I will add the details to the quilt.  Make sure you follow my Facebook or Twitter Accounts for updates on the quilting progress.


While, the tulip is on the longarm, I decided to do a little catch up on some of my 2012 Designer Mystery BOM, I left off on Block 9.  So, I pulled out #10 "Sunday Drive".  I was fairly easy of a block to do, like the others in the past.





Now all I have left is #11 & #12 and I can start putting this quilt top together, which I'm looking forward to since 2013 Designers BOM has started.

Tina

No comments:

Post a Comment