After the layout was completed on the design wall and the power had been stable for a good 4-5 hours. I decide to go ahead and get the quilting done on T-shirt #1 (Brown and Tan).
By the mid-evening, I had the 106" x 110" quilt done. My customer asked for double batting on the quilt so I used Quilter Dream Midnight Dream Poly Batting on the quilt. The quilt will be a nice warm quilt, but the only bad thing about the double batting it makes the quilt real heavy when finished.
The back came out beautifully, I used a few extra T-shirts in the back toward the top middle. Also in the backing I used the Tan Marble fabric in the middle and the Dark Saddle Fabric on the each of the sides of the Tan fabric.
The quilt came out beautiful, so today I was able to the binding on the front of the quilt with help from a friend, thanks Lynn. Now I get to start sewing the binding on the back while the hockey game is on.
Also, Today, I finished resizing T-shirt #2 quilt and the cutting all the pieces of sashing, so tomorrow I can sew and hope to get the quilt almost done.
But now, it is time for binding!
Tina
No comments:
Post a Comment